South Carolina Canal and Railroad Company

South Carolina Canal and Rail Road Company

Locale South Carolina
Dates of operation 1827–1843
Successor South Carolina Rail Road
Track gauge 5 ft
Headquarters Charleston, South Carolina

Chartered in 1827, the South Carolina Canal and Rail Road Company ran scheduled steam service over its 136-mile (219 km) line from Charleston, South Carolina, to Hamburg, South Carolina. beginning in 1833. At that time it was the longest railroad in the world. It was also known as the Charleston and Hamburg Railroad, although it is unclear if that was a legal name, a subsidiary name, or just a nickname. In 1844, this line merged with the South Carolina Rail Road, which had replaced the abortive Louisville, Cincinnati and Charleston Railroad in December 1843.

Contents

History

With the advent of cotton in the early 19th century, the relatively remote South Carolina upcountry enjoyed a vast expansion in the value of its agricultural produce. Overland transport by wagon was slow and expensive, so this produce tended to go to Augusta, Georgia, then down the Savannah River to the seaport at Savannah, Georgia. The SCC&RR Company was chartered in 1827 to divert this commerce to Charleston by means of connections to Columbia, Camden and Hamburg. Despite its novelty the project was pursued by its Charleston leaders with aggressive method, public demonstrations encouraging support for the daring concept of a steam-driven railroad. Under William Aiken as the first president, six miles (10 km) of line were completed at Charleston in 1830. The first run over the entire line was celebrated in October 1833.

The line was a commercial success despite price competition against riverborne traffic and later railroad projects in Georgia. Its initial cost of $951,148[1] was doubled by early way improvements, at that price still quite economical. This satisfying position blew up in the course of an overly ambitious overmountain expansion under the name of the Louisville, Cincinnati and Charleston Railroad. The SCC&RR successfully weathered the Panic of 1837 and overhanging debt from the busted LC&CRR, but not without a retrenchment that continued through the next decade.

Early engineering

The SCC&RR was fortunate in its chief engineer, Horatio Allen, who had already toured English railroads, and drove the Stourbridge Lion on its first and only run in America. Allen argued successfully before the SCC&RR directors for immediate adoption of steam locomotion, stating that the power of horses was known and would never increase, but the future power of locomotives was beyond imagination. The first locomotive was the Best Friend of Charleston of 1830; by 1834 the line had purchased a total of 15 locomotives and scheduled one daily run in each direction.

The way consisted of flat strap iron fastened to continuous timber sills. Much of the way passed easily through South Carolina's monotonously flat Pine Barrens. Elsewhere, the track was elevated - frequently over long distances - on timber pilings. A drop of 180 ft (55 m) over a 3,800 ft (1,200 m) run into Horse Creek Valley required an inclined plane, with a steam-powered winch later replaced by a locomotive used as a counterweight. Delays at this archaic bottleneck brought about the railroad town of Aiken, South Carolina, as a stopover place.

The line was built with 16 equally spaced turnouts each with a water pump and timber shed. A maintenance station responsible for perhaps eight miles (13 km) of track was based at each turnout. The station overseer surveyed half of that track daily, and effected minor repairs such as making secure loose bars of iron, punching down protruding spikeheads, chamfering wheel flange rubs off the rails, ramming earth around the piles, and so on. The overseer was also responsible for maintaining adequate supplies of water and timber at the station, and for calling on the Superintending Engineer for nonroutine derangements.

Timber pilings had allowed the SCC&RR to build their line quickly and cheaply, especially in comparison with northern lines such as the Baltimore and Ohio that tended to overbuild. Nevertheless by 1834 the pilings began to rot at the ground line, and were supplanted by earthen embankments made by dumping dirt over the side (encasing and preserving some of the longleaf pine structures to this day). Beginning in 1836 the flat strap rails were replaced with "T" rails.

Wood rot was an early maintenance evil. By 1841 a surface treatment called Kyanizing was found to be helpful, and shortly thereafter the cheaper (and less dangerous) Earlizing with copper and iron sulphates was adopted.

Novel and clumsily designed locomotives were a great expense with generally half of the large fleet laid up for repairs, modification or breaking up. These early machines suffered from slightness in the drive wheels, axles and valve gear, and from unequal distribution of weight, a serious problem given the questionable track they ran on. Inside actions were eventually converted to outside. The early eight-wheeled locomotives shared these problems along with overly weak frames, but otherwise were appreciated for greater power and less injury to the road. With limited facilities in an agricultural economy, all of these shortcoming resulted in long outages. Through 1834, locomotives had been purchased from six different suppliers.

The original line generally paralleled U.S. Route 78 and remained in service until the 1980s. The downtowns of many railroad towns such as Warrenton, Williston and Blackville are still marked by railroad esplanades frequently with elevated causeways.

Branches

Columbia

In accordance with the original charter, a 60-mile (97 km) line from Branchville to Columbia was built by the LC&CRR, and opened in 1842.

National Historic Landmark in Charleston

William Aiken House and Associated Railroad Structures is a historic district in Charleston, South Carolina, that contains structures of the South Carolina Canal and Rail Road Company and the home of the company's founder, William Aiken. These structures are considered "nationally significant" in relation to the history of the development of the railroad industry in the United States.[2] The South Carolina Department of Archives and History states that the structures in this district "represent the best extant collection of antebellum railroad structures illustrating the development of an early railroad terminal facility." [2] The railroad company with which they are associated was the first to use steam from the beginning of its operations, use an American-made locomotive, and carry U.S. mail.[2][3] When it began operation in 1833 it had the greatest length of track in the world under single management.[3]

The district was declared a National Historic Landmark in 1963.[3][4] Contributing structures in the district include:[3]

References

  1. ^ A Short History of South Carolina, 1520-1948, David Duncan Wallace, page 377
  2. ^ a b c "William Aiken House and Associated Railroad Structures (456 King St., Charleston)". National Register Properties in South Carolina listing. South Carolina Department of Archives and History. http://www.nationalregister.sc.gov/charleston/S10817710007/index.htm. Retrieved 2008-03-21. 
  3. ^ a b c d James Dillon and Cecil McKithan (May 12, 1981). National Register of Historic Places Inventory-Nomination: William Aiken House and Associated Railroad StructuresPDF (32 KB). National Park Service.  and Accompanying seven photos, from 1961 and 1975PDF (32 KB)
  4. ^ "William Aiken House and Associated Railroad Structures". National Historic Landmark summary listing. National Park Service. http://tps.cr.nps.gov/nhl/detail.cfm?ResourceId=523&ResourceType=District. Retrieved 2008-02-12. 

External links

Preceded by
none
South Carolina Canal and Rail Road Company
1827 – 1843
Succeeded by
South Carolina Rail Road